Residential deck services

Deck construction and replacement across the Greater Toronto Area

We build new residential decks and replace worn-out ones, including ground-level platforms, raised decks with stairs and guards, and decks beside pools or fence lines.

Tell us the dimensions, property location, and how you want to use the deck. We'll assess the project.

Photos and rough measurements help. Include a survey or drawing if you have one.

Landscaped low composite deck behind a renovated Toronto brick semi-detached home

Build new, replace, or assess the damage?

Choose the project that matches your yard.

There is no deck there yet

You may have a door that opens onto nothing, an unusable slope, or a yard that needs somewhere to sit. We turn that idea into a structure that fits the lot, house, and access.

Start a new deck project

The existing deck needs replacement

You may want a different layout, or an assessment may find widespread structural problems. We remove the old deck and rebuild the structure. Existing footings stay only when their condition and project requirements allow it.

Plan a replacement

You are not sure it needs replacing

Some decks look worse than they are; others hide damage below the surface. An assessment determines whether the existing structure has useful life left.

Get a deck repair assessment
Completed raised wood deck with black guards and stairs behind a GTA brick home
Low grey deck fitted between a Toronto brick home and laneway garage

What a deck project covers

A deck is a structure before it is a surface. We scope every part of a new installation or replacement.
Part of the deckWhat it coversWhat decides it
Footings and foundationsBelow-grade support for the whole structureSoil, frost depth, deck size and height, attachment, and municipal requirements
Frame and substructureBeams, joists, posts, and the ledger connection where attachedSpan, elevation, attachment method, and surface support requirements
Walking surfaceDecking boards, fastening, and edge finishesMaterial, board direction, and framing below
Stairs and landingsThe route to grade and any intermediate landingDeck height, grade, and landing position
Railings and guardsPosts, rails, balusters or panels, plus stair handrailsDeck height and project requirements
Attached privacy screeningScreening built into or supported by the deckSightlines, neighbours, and structural support
Deck access gateA gate at stairs or where the deck opens to the yardHow the deck needs to control access
Existing-deck removalDemolition, disposal, and site preparationStructure size, condition, and equipment access

A property-line gate is a separate fence-gate scope. See our fence gates page. For standalone deck railings, stairs, or screening, tell us what you need so we can assess the structure supporting it.

Raised wood deck with black guards, attached privacy screening, and a backyard access gate

Choosing the decking material

Most GTA deck projects use one of three material directions. The main differences are upfront cost, appearance, and ongoing care.
ComparisonPressure-treated woodCedarComposite
Upfront costUsually the lowestUsually higher than pressure-treated; grade mattersUsually the highest; product line matters
Ongoing careRegular cleaning and re-finishing after the wood driesRegular cleaning and re-finishing to retain colourWashing, with no staining or sealing
How it agesWeathers grey and may cup, check, or splitWeathers to silver-greyRetains colour, with product- and exposure-dependent fading
Repair and matchingBoards are easy to replace; new wood takes time to weatherBoards are easy to replace; new wood takes time to matchReplacement depends on the product line and colour remaining available
Summer sunCan get hot; colour and exposure matterCan get hot; colour and exposure matterCan get hot; darker boards are often hotter in direct sun
Often chosen forBudget-led projects and large surfacesA natural wood appearanceLess finishing work

Lifespan and warranty terms depend on the product, exposure, and maintenance. We'll direct you to the manufacturer's warranty for the boards you choose.

Cedar, pressure-treated wood, and composite deck-board samples beside a finished deck
Three deck-board material and colour options in a GTA backyard

What holds the deck up matters more than what you walk on

Damage can develop below the walking surface, so an assessment looks past the boards.

Footings

Depth, size, and spacing depend on deck size, height, load, and frost movement. An assessment determines whether existing footings can be reused.

Ledger and attachment

An attached deck transfers load through a ledger at the house. The connection must carry the structure while keeping water out. Detached decks use their own posts and a different framing plan.

Elevation, grade, and drainage

Height affects guards, stairs, and clearance. A sloped yard changes post heights and stair runs, while drainage must move water away from the structure.

Backyard access

Narrow side yards, removable gates, shared walkways, stairs, and mature planting affect how materials enter and demolition waste leaves.

Deck frame with exposed joists, metal connectors, and concrete footings
Elevated composite deck and long guarded stair built on a sloped York Region lot

Decks next to a pool or fence

Each backyard structure keeps its own scope.
ScopeWhat it covers
The deckA pool-adjacent deck includes the frame, footings, boards, stairs, and guards.
The pool enclosureThe pool fence and self-closing gate follow municipal safety requirements. They are separate from the deck and covered by our pool fencing service.
The property-line fenceA wood fence remains a separate structure. See wood fencing.

One inquiry can cover connected backyard work, with each scope listed and priced separately.

Multi-level composite deck and fenced backyard pool behind a Mississauga brick side-split
Raised deck beside a separate black metal pool enclosure in a GTA backyard

Permits, drawings, and who is responsible

Permit requirements depend on the deck and property. Toronto's decks and porches guide explains its application requirements. Other GTA municipalities run their own process.
ResponsibilityWhat the agreement should state
Permit requirementWho confirms whether this deck needs a permit
DrawingsWho prepares them and holds any required qualification
ApplicationWhose name appears on it and who submits it
Municipal commentsWho responds and revises the submission
InspectionsWho books them and at which stages
DeficienciesWho corrects them and who pays
DelaysHow approval delays affect the schedule and price

Ontario's guidance on starting home renovations or repairs recommends putting the work, materials, warranty, payment, schedule, cleanup, subcontractors, and permit responsibility in the contract.

What moves the number on a deck quote

Price per square foot cannot capture the full quote because two decks of the same size can differ widely.
FactorWhy it moves the price
Size and heightMore surface means more framing and material; elevation may add posts, longer stairs, and guards
Attached or detachedThe ledger connection or extra structure needed for a freestanding deck
Footings and framingQuantity, depth, digging conditions, spans, beam sizing, and surface support
Surface materialBoard cost, fastening, framing needs, and edge details
Stairs, guards, and componentsFlights, landings, handrails, railing length, privacy screening, and gates
Removal and accessDemolition, disposal, hidden conditions, and how material moves through the property
Grade, drainage, and approvalsSlope work, water management, drawings, applications, and inspections
Adjacent workFence, pool enclosure, or gate work quoted as a separate scope

Compare quotes line by line, especially demolition, footings, stairs, guards, and disposal.

How a deck project runs

  1. 1

    Send the details

    Share dimensions, location, intended use, and photos of the space or existing deck.

  2. 2

    Initial review

    We review the request and ask for any missing details.

  3. 3

    Site assessment

    We measure and check access, grade, drainage, and the house connection.

  4. 4

    Written scope

    The proposal states inclusions, exclusions, materials, and components.

  5. 5

    Approvals and drawings

    Where required, these follow the municipality and project.

  6. 6

    Materials and scheduling

    Ordering and scheduling follow the confirmed scope and product availability.

  7. 7

    Construction

    Work moves through demolition, footings, frame, surface, stairs, guards, and components as scoped.

  8. 8

    Inspections

    Required inspections happen at the stages set by the municipality.

  9. 9

    Walkthrough

    We review the finished structure with you.

Start dates and build durations depend on approvals, material lead times, and weather. We'll give you dates for your project.

Deck project questions

Answers to common planning, material, permit, and replacement questions.

It depends on the deck and property, mainly its height above grade, attachment, size, and position on the lot. Toronto's decks and porches guide explains what an application needs and notes that some detached decks may not require a permit. Every GTA municipality runs its own process, so confirm with yours.

Pressure-treated wood usually costs the least upfront and needs periodic re-finishing. Cedar usually costs more and also needs finishing to retain its colour. Composite usually costs the most and needs washing rather than staining. Product grade and colour affect cost, and any surface can get hot in direct sun. Darker composite boards are often hotter.

Only after the frame is assessed. A new surface on a failing frame hides the problem, and the frame must support the new material. Start with a deck repair assessment.

It depends on how much of the structure is affected, whether the frame and footings are sound, whether components can be made safe, and whether material can be matched. Surface damage on a sound structure may suit repair. A failing frame may make replacement the better scope. Start with an assessment.

They are part of the structure and quoted with it. Check that stairs and guards are listed explicitly so you can compare quotes accurately.

We build the deck. The fence and gate enclosing the pool are a separate scope with their own safety requirements, covered by our pool fencing service. We can assess both under one inquiry and quote them separately.

Tell us early. A narrow side yard, locked shared walkway, removable gate, stairs, or mature planting can change how materials enter and waste leaves the property.

Pressure-treated and cedar decks need regular cleaning and re-finishing, plus checks of fasteners and hardware. Composite needs washing and the same hardware checks, but no staining or sealing. Keeping water away from the structure helps protect every deck.

Sometimes. Their condition, size, spacing, and suitability for the new deck must be assessed against the project and municipal requirements. A replacement quote should state whether the existing footings can stay.

Send rough dimensions, the property address or postal code, photos of the space, and how you want to use the deck. Include a survey, existing drawings, or permit documents if you have them.

Still have questions?

Call Us: (437) 447-5221

Tell us what you are planning

Send rough dimensions, the property address, photos, and any drawings or survey you have. Submitting the form starts an assessment; it does not confirm a booking, price, or date.